Skip to main content
Installation of Devices
Detector:
|
Detector |
- Ceiling to Detector = 4 “ min ( 102mm ) to 12” max ( 305mm )
- Detector from Sidewall = 4” ( 102mm )
Or = 3’ (36”) (914mm)
Return Diffuser
MCP ( Manual Call Point ):
|
MCP |
- MCP Install from the Exit Door = 5’ max ( 1524mm ).
- MCP Handle Install from Ground level = 42” min to 48”
max ( 1067mm to 1219mm ).
Hooter :
|
Hooter |
- Hooter Install Below Ceiling = 6” min ( 152.4mm ) Min.
- Hooter Install From Ground Level = 90” min ( 2286mm )
Min.
Flash or Strobe Hooter :
|
Flash Hooter |
- Ceiling Height less than 86” ( 2180mm ).
- Visual Lens Mounting Height 6” ( 150mm ) of the Ceiling.
- Top of the lens Ground level = 96” max ( 2440mm ) max.
- Bottom of the lens Ground level = 80” min ( 2032mm )
min.
Comments
Post a Comment